Saltar para:
Esta página em português Ajuda Autenticar-se
ESTS
Você está em: Start > CE13
Autenticação




Esqueceu-se da senha?

Campus Map
Edifício ESTS Bloco A Edifício ESTS Bloco B Edifício ESTS Bloco C Edifício ESTS Bloco D Edifício ESTS Bloco E Edifício ESTS BlocoF

Installation and maintenance of HVAC&R equipment and DHW

Code: CE13     Sigla: IMEAA

Áreas Científicas
Classificação Área Científica
CNAEF Electricity and energy

Ocorrência: 2021/2022 - 1S

Ativa? Yes
Unidade Responsável: Departamento de Engenharia Mecânica
Curso/CE Responsável: Professional Technical Higher Education Course in Acclimatisation and Energy

Ciclos de Estudo/Cursos

Sigla Nº de Estudantes Plano de Estudos Anos Curriculares Créditos UCN Créditos ECTS Horas de Contacto Horas Totais
APIEF 0 Plano de Estudos 2016/2017 2 - 6 60 150
TSPCE 3 Plano de Estudos_2015_16 2 - 6 60 150

Docência - Responsabilidades

Docente Responsabilidade
João Francisco dos Santos Fernandes

Docência - Horas

Theorethical and Practical : 4,00
Type Docente Turmas Horas
Theorethical and Practical Totais 1 4,00
Nuno António Ramos Cristo 4,00

Língua de trabalho

Portuguese

Objetivos

Know the procedures for Installation, Reception and Maintenance of HVAC&R and DHW Installations

Resultados de aprendizagem e competências

Describe installation and maintenance procedures and prepare maintenance plans.

Modo de trabalho

Presencial

Programa

1. Procedures for Receiving Technical Installations.
2. Maintenance
a) Maintenance Organization and Maintenance Plans.
b) Preparation of reports of interventions carried out.
c) Measurement and correction of vibrations and noise in buildings.
3. Specific Actions in Heating Installations
a) Efficiency measurement in boilers.
b) Installation and maintenance routines in boilers and heat pumps.
c) Installation, tests and maintenance routines for solar thermal systems.
4. Specific Actions in HVAC Installations
a) Installation and procedures inherent to good practices for interconnecting components, checking and starting up the main HVAC systems.
b) Pump installation procedure. Detection and correction of malfunctions in pumps.
c) Maintenance routines for the main HVAC systems. Filter maintenance.
5. Specific Performances in Electrical Installations
a) Installation of electric motors and control and protection devices for electric circuits associated with HVAC systems.
6. Specific Activities in Refrigeration: a) Characteristics of the installation, regulation and operation of components of a refrigeration network: test of the characteristics of a refrigeration circuit, installation and regulation of thermostatic expansion valves, pressure switches, thermostats, modeling valves and non-modelling, particle filters and dryers. Control the capacity of refrigerator circuits.
b) Handling of Fluorinated Greenhouse Gases.
c) Installation of room hygrostats and respective regulation.

Bibliografia Obrigatória

Luís Roriz; Climatização, Concepção, Instalação e Condução de Sistemas, Edições Orion, 2006
P. Koelet; Industrial Refrigeration - Principles, Design and Applications, The MacMillan Press

Métodos de ensino e atividades de aprendizagem

Exhibition, field trips, laboratory work.

Tipo de avaliação

Distributed evaluation without final exam

Componentes de Avaliação

Designation Peso (%)
Trabalho escrito 100,00
Total: 100,00

Componentes de Ocupação

Designation Tempo (Horas)
Estudo autónomo 90,00
Frequência das aulas 60,00
Total: 150,00

Obtenção de frequência

Approval of the work.

Fórmula de cálculo da classificação final

Approval of the work.
Recomendar Página Voltar ao Topo
Copyright 1996-2024 © Instituto Politécnico de Setúbal - Escola Superior de Tecnologia de Setúbal  I Termos e Condições  I Acessibilidade  I Índice A-Z
Página gerada em: 2024-11-23 às 14:38:10